HardwareMVP with early customers

Handmade solid-oak desk lamps with warm dimmable LEDs, built in a small workshop in Tallinn and shipped across Europe.

Visit website

Team

  • Test User

Latest slide · Week 45

Northwind LampsTest User
First update · no goals to checkNov 2 – 8, 2026
What actually happened

We switched to a molded pulp insert and a double-wall box, so breakage on the last 40 orders dropped to zero. We also moved the shop to a single product page with three finishes, and conversion went from 1.4% to 2.1%.

Read the full update
Key metric · Sales€4.5k / €6k goal
Morale9/10
Talked to12
Next week
  • Ship all 48 open orders before Friday
  • Sign a backup wood supplier
  • Launch the wall-mounted lamp waitlist
Ask

Introductions to a second oak or ash supplier in the Baltics or Finland who can deliver kiln-dried boards in small batches.

Learned from users

Buyers care more about the warm light temperature than the wood finish. Three customers asked for a wall-mounted version for reading nooks, and two said the box arrived dented, which made the lamp feel cheaper than it is.

Biggest blocker

Our oak supplier pushed delivery of the next batch by three weeks, so we can only build about 60 lamps before the holiday rush.

Full update
  1. Nov 2 – 8, 2026

    Launched
    Sales
    €4.5k
    Morale
    9/10
    Talked to
    12
    Goals for next week
    • Ship all 48 open orders before Friday
    • Sign a backup wood supplier
    • Launch the wall-mounted lamp waitlist
    Learned from users

    Buyers care more about the warm light temperature than the wood finish. Three customers asked for a wall-mounted version for reading nooks, and two said the box arrived dented, which made the lamp feel cheaper than it is.

    Biggest change

    We switched to a molded pulp insert and a double-wall box, so breakage on the last 40 orders dropped to zero. We also moved the shop to a single product page with three finishes, and conversion went from 1.4% to 2.1%.

    Biggest blocker

    Our oak supplier pushed delivery of the next batch by three weeks, so we can only build about 60 lamps before the holiday rush.

    Ask

    Introductions to a second oak or ash supplier in the Baltics or Finland who can deliver kiln-dried boards in small batches.